Thursday 4 December 2014

Day of Filming

After we assembled the walls, wall papered, painted over them, placed the tilings and added  the props we arranged our lighting and camera equipment into position.







On the 25th of November Group A gathered the lighting equipment from the storage room and had them set up for our rehearsal filming, taking footage of our set to get into practice for our day of filming.








On the 26th of November at 9am group A meet in room G12 all met for that shoot. Our actor Simon arrived and our group director Thomas gave him a rundown of the scenes that we're shootings.







 One of our fellow students had taken on the job of catering, making sure that there was food and drink to sustain our actor and the rest of our filming crew. 




Afterwards we disassembled our lighting and camera equipment and backed it all up, the props on set and the titles we're removed and packed away also to make room for Group B's film shoot. Overall it was a professional day of filming at its best and on schedule. We now have the film entirely shot and we'll be editing it in throughout the following weeks up until our hand in date in February.