Thursday 27 November 2014

Constructing the set


In studio B12 me and the other students were assigned to assemble the set for our UCA advert project.



We were provided with two wall structures and supports to hold them in place. The wall is meant to represent the the interior of an art gallery.


We scraped off the remains of the old news paper from the wall, placed on new wallpaper and then painted over it.




We bought tiling which we measured, trimmed then arranged onto the ground of our set, its to give the impression of the floor like surface of an art gallery in our film.

I








This process of building the set took as long as two weeks.  Once we place the props in place and gathered the lighting and filming equipment we'd be ready to start filming in the following week.



No comments:

Post a Comment